Planning Guide

Ground-mounted solar panels in Australia

Solar panels across the roof of a large warehouse, with trucks in the yard

Your solar rebate, checked before you sign

WST

By Why Solar Team

Find out what your home actually needs

Published . Updated . Checked on 27 October 2026.

Ground mounted solar panels are an array on a frame fixed to the ground instead of a roof. A ground-mounted system can claim small-scale technology certificates (STCs) when it meets the same Clean Energy Regulator conditions as a roof system, and the Regulator lists ground mounted systems as a mounting type. The extra things to settle are council approval, the frame and wind, cabling between the array and the switchboard, and the network application.

Ground-mounted vs roof-mounted solar

PointRoof-mountedGround-mounted
Where it sitsFlush on sloped roofs, on tilt frames on flat roofs (energy.gov.au)On a frame fixed to the ground
Direction and shadingSet by the roof. Trees and buildings can shade it, so consider tree growthShading reduces generation, so the site and layout matter (energy.gov.au)
ApprovalsMost rooftop solar needs no planning approval, but restrictions may applyDepends on state and council, see below
STC eligibilitySame CER conditionsSame CER conditions, mounting type listed
CablingInstaller design choiceInstaller design choice. Long cable runs are a recognised price driver (energy.gov.au), and an underground run needs suitable cable
Network applicationConnection application with the network operatorSame connection application with the network operator

Find out what your home actually needs

Free, takes about two minutes, no obligation.

Cost of a ground-mount system

The price of a ground-mount system is set by your site and the quote you receive, and the same factors apply as for any solar panel cost. energy.gov.au lists them as system size, hardware quality, installation quality and after-sales service, installation challenges, extras such as extended cabling and rack mounting, and adding a battery.

For a ground-mount system, the frame and the cable run between the array and the inverter or switchboard are items to see itemised on a quote. energy.gov.au says a quote should show a breakdown of equipment and installation costs, and any extra work required and who will do it.

A written quote for your site is the way to compare. If both are possible on your property, Why Solar suggests asking for the same system size on the roof and on the ground, so the two quotes compare like with like.

Approvals and council rules by state

Rules for ground-mounted systems depend on your state, your council and your land. Most of the sources below describe rooftop solar or solar systems in general, and a ground frame may be treated differently, so check with your council before you sign. Here is what each source says, as at 27 October 2026.

  • energy.gov.au (rooftop solar): most rooftop solar can be installed without planning approval, but there may be restrictions on size or how it is installed. The design must comply with local regulations, and your installer should be familiar with planning rules.
  • NSW Planning Portal (solar energy systems in general): solar energy systems may be installed as exempt or complying development under the State Environmental Planning Policy (Transport and Infrastructure) 2021. Works must be structurally adequate, installed in accordance with the manufacturer's specifications and comply with the Building Code of Australia. Exempt development generally cannot be carried out on land with an item on the State Heritage Register or in critical habitat of an endangered species. The page was last updated 5 June 2023 and does not set out standards for ground frames.
  • South Australia: this comes from one council page, not a state rule. The City of Norwood Payneham and St Peters says a solar system under 100 kg does not need a development application unless it is over 5 MW and grid connected, on a State Heritage Place, or visible from a public street at a Local Heritage Place. For a heavier system its conditions mention panels fitted parallel to the roof, so those conditions are about roofs. Ask your council how a ground frame is treated.
  • Victoria: AusNet says that depending on where you live you may need planning approval from your local council, and you should contact them. These pages do not set out the rule for a home ground frame, so ask your council.
  • ACT (solar systems in general): energy.gov.au says most solar systems do not need development approval, and your installer or retailer can advise.
  • Queensland, Western Australia, Tasmania and the Northern Territory: this page does not cover planning rules for ground-mounted systems in these places. Ask your local council and your installer before you sign.

Bushfire-prone land

These are general bushfire-area rules, not solar rules. The NSW Rural Fire Service says any proposed development on bush fire prone land has a legal obligation to consider bush fire and meet the requirements of Planning for Bush Fire Protection 2019, and you can check whether land is mapped using its tool or the NSW Planning Portal. Planning Victoria says the Bushfire Management Overlay applies to areas with very high and extreme hazard and triggers planning permit requirements, including defendable space and water supply. Neither page mentions solar, so we cannot say how they apply to a home ground-mounted array. Ask your council or fire authority if your land is mapped.

Network application

A ground-mounted system needs the same connection application as any other system. In most states the installer or retailer lodges it, and energy.gov.au says it needs approval before installation. Ausgrid says approval is required before a system can be turned on, and Energex says installation must not start until you accept the connection offer. Your network operator can also set limits on system size and on export.

Mounting types, wind and footings

A ground frame is a different structure from a roof mount, so ask your installer.

Fixed frames hold the panels at one angle. energy.gov.au describes tilt frames as holding panels at an angle to face the sun, with rows spaced so they do not shade each other, and says rack mounting adds to cost. The CSIRO says many ground-based solar PV systems use mechanical tracking to keep the modules facing the sun through the day, but that tracking is rarely practical for building-based systems. Ask your installer whether the tilt can be changed and how.

The Solar Victoria audit checklist is written for roof arrays, but it shows what an auditor looks for: installation to the manufacturer's instructions, engineering certification, wind actions under AS/NZS 1170.2 and AS/NZS 5033:2021, corrosion resistance and earthing above 35 V DC.

  • Which frame is used for my site, and is it fixed or does it track?
  • Can I see the manufacturer's installation instructions and engineering certification?
  • How are wind actions under AS/NZS 1170.2 met for my site?
  • How is the frame protected against corrosion, and is it earthed where the DC voltage is above 35 V?
  • What footings does the frame need for my soil?

Cabling, trenching and inverter placement

For rooftop systems, energy.gov.au says the inverter should sit close to the switchboard, ideally on a shaded wall, with a cover if it is not shaded. That is rooftop guidance, and a ground array may have a longer DC run, so agree the inverter position before installation. The Solar Victoria checklist looks for DC cables rated for the voltage and current and protected from mechanical damage and UV.

If cables run underground, the Electrical Regulatory Authorities Council (ERAC) says in its advisory note that PV DC cables that conform only to IEC 62930 cannot be installed underground. For underground DC runs, the cable must comply with a relevant standard for underground cables. Trench depth, conduit and cover are for your installer and the electrical standards to set, and we do not give a depth here.

  • Where will the inverter go?
  • How far is the cable run from the array to the switchboard?
  • Is any of the run underground, and what cable standard does it meet?
  • How deep is the trench and what conduit is used?
  • How is the cable protected?

Do ground-mounted panels get STCs?

Yes. A ground-mounted system can create STCs if it meets the same Clean Energy Regulator conditions as any small-scale system. The CER's STC claim data guide lists ground mounted systems as a system mounting type. The conditions, as at 27 October 2026, are:

  • The designer and installer are accredited by Solar Accreditation Australia (SAA), and the installer holds an unrestricted electrical licence in the state or territory.
  • The panels and inverter are on the Clean Energy Council approved list at installation.
  • The system meets Australian and New Zealand standards and all local, state and territory requirements.
  • STCs are created within 12 months of installation.
  • The system is 100 kW or under and under 250 MWh of output a year.
  • It generates at the premises where it is installed.

STCs are assigned to a property address, not an owner. You can use the STC calculator to work out your entitlement.

Your rebate, worked out to your address

Then one Why Solar Approved installer near you, and fifteen minutes with a solar expert before you sign.

When ground-mount is the better choice

  • Shaded or south-facing roof. South-facing panels generate less, and shading from trees or buildings reduces generation.
  • Roof that needs work soon. energy.gov.au says to do roof repairs or replacement before installing panels.
  • Flat roof. Tilt frames may be needed anyway, rows need spacing, which may reduce how many panels fit, and rack mounting adds to cost. See solar panels on a flat roof.
  • Limited roof space. The number of panels that fit is one input to system size. See solar system sizes and oversized solar systems.

If you are on a property with land, see farm solar panels. For a system with no grid connection, energy.gov.au says off-grid solar needs a large battery and control system and specific expertise that not every installer has.

Maintenance

The Clean Energy Regulator says to have the panels checked for safety every year by a licensed electrician accredited by SAA. Damage can come from dust, water seepage, vermin, hail, wind and sunlight. The CER does not regulate maintenance, so ask your installer for a schedule. Questions for your installer:

  • What vegetation clearance is needed around the frame?
  • How will the area around the frame be kept clear for mowing?
  • What protects the cabling from animals?

FAQs

Do ground-mounted solar panels need council approval?

expand_more
It depends on your state, your council and your land. In NSW, solar energy systems may be exempt or complying development under the State Environmental Planning Policy (Transport and Infrastructure) 2021. One South Australian council page describes its exemption for heavier systems as panels fitted parallel to the roof. These sources describe solar systems generally or roof systems, and a ground frame may be treated differently. Ask your council before you sign.

Do ground mounted solar panels qualify for the STC rebate?

expand_more
Yes, if the system meets the same Clean Energy Regulator conditions as any small-scale system. The CER lists ground mounted systems as a system mounting type for STC claims. The installer must be SAA accredited, and the panels and inverter must be on the Clean Energy Council approved list.

Is ground-mounted solar more expensive than rooftop?

expand_more
The price depends on the same factors as any system, such as size, components, installation and extras. The frame and cabling are the items to see itemised on a quote. Compare written quotes for your site. We give no figure for the difference.

Can I mount solar panels on the ground at home?

expand_more
Often yes, but it depends on your state, council and land. The Clean Energy Regulator recognises ground mounted systems as a mounting type for STC claims, so the system can be eligible. Check with your council before you sign.

What do I need to ask an installer about a ground-mounted system?

expand_more
Ask which frame is used, whether it is fixed or tracks, and for its installation instructions and engineering certification. Ask where the inverter goes, how far the cable run is, whether any is underground, how deep the trench is and what conduit is used.

Do ground-mounted solar panels need a network connection application?

expand_more
Yes, the same connection application as any system, normally lodged by your installer or retailer. In most states it needs approval before installation. Your network operator may set limits on system size or export.

Sources

Checked on 27 October 2026.

Get a quote from a Why Solar Approved installer

We match you with one installer who has passed all six of our checks. You get one written quote, and a 15-minute call with one of our solar experts before you sign. Getting a quote through us is free, with no obligation to go ahead. Installers pay us a set fee for each introduction.

The next step

If you're considering solar panels or batteries for your home, Bec and the team can match you with one Why Solar Approved installer near you for a free written quote, and fifteen minutes with a solar expert before you sign.

Headshot of Bec Ramirez, Aussie Mum & Energy Expert at Why Solar

Written by

Bec Ramirez

Aussie Mum & Energy Expert

Helps families switch to solar with practical, real-world advice. Bec focuses on the financial side: rebates, bill savings and financing options, so everyday Australians can see real value from going solar.

If you have any questions about the information in this guide, email hello@whysolar.com.au or call +61 2 5657 6527.

More about Bec

Make Why Solar a preferred sourceWe'll appear more often in your Google Top StoriesAdds Why Solar to your Google preferred sources, so we show up more often in your Top Stories and AI Overviews.
Share with a mate
Up to $8,000+ in solar and battery rebates · Federal rebates step down in 40 daysSee how we calculate this