Do I need council approval for a solar battery in NSW?

A home battery mounted on a brick wall beside a side fence

Your battery rebate, checked before you sign

WST

By Why Solar Team

The federal battery rebate steps down on 1 January 2027.

Battery rebate steps down on 1 January 2027 (rate set by install date)

Not ready yet? Get the battery size guide

Published . Updated . Checked on 26 November 2026.

Many NSW homes can add one solar battery without council approval, but it is not automatic. This guide sets out the three planning pathways for a solar battery under the State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2, Division 4: exempt development, complying development and a development application. It also explains why network approval, rebate conditions and the AS/NZS 5139 installation standard are separate from planning approval. This is general information, not legal advice, so confirm your pathway with your council, a registered certifier or your installer before you sign.

The short answer

Often no. In NSW, a solar battery system often needs no council approval if it is not capable of storing more than 20 kWh, the development does not result in the installation of more than one system, and it meets every other exempt development requirement in subsection 2.41(5) of the Transport and Infrastructure SEPP. A larger system, or a second battery system on the same site, will usually need a Complying Development Certificate (CDC), or a development application (DA) if it cannot use the CDC pathway.

That answer is not automatic. Each pathway has a list of conditions, and missing one moves you to the next pathway. The exempt and CDC pathways both include Clean Energy Council and Solar Accreditation Australia conditions, so check your quote for a Clean Energy Council approved battery and an SAA accredited installer. You can look up your property's zoning and any heritage listing on the NSW Planning Portal.

Planning approval is also separate from network approval and from rebate paperwork. A rebate or a connection offer from your network does not settle which planning pathway applies. For the money side, see the NSW battery rebate guide and our page on solar batteries in NSW.

PathwayCapacity and system testsWhat it means
Exempt developmentThe system is not capable of storing more than 20 kWh, the development does not result in the installation of more than one system, and the other s 2.41(5) requirements are metNo CDC and no DA
Complying development (CDC)The maximum storage of all solar battery systems on the site does not exceed 100 kWh in a prescribed residential zone, or 200 kWh on other land, and the other s 2.39(2C) requirements are metA CDC from council or a registered certifier, issued before work starts
Development applicationThe proposal cannot use the exempt or CDC pathwayA DA or modification to the relevant consent authority, usually the council

Capacity is only one test. These pathways also apply only to a battery that meets the SEPP definition of a solar battery system, set out below, and only when every other condition of the pathway is met.

Your battery rebate, checked before you sign

The federal battery rebate steps down on 1 January 2027. One Why Solar Approved installer near you, and fifteen minutes with a solar expert before you sign.

Battery rebate steps down on 1 January 2027 (rate set by install date)

Not ready yet? Get the battery size guide

What counts as a solar battery system

Section 2.35 of the Transport and Infrastructure SEPP defines a solar battery system as "a battery system designed only for the purposes of the storage of photovoltaic solar energy generated from a solar energy system."

The test is what the battery is designed to do, not only its size. A battery designed to charge from the grid, to trade electricity, or to operate as standalone storage may fall outside this definition. If it does, the exempt and CDC pathways on this page do not apply to it, and it needs a different pathway. IPART's summary of the SEPP lists a NSW planning contact for batteries that do not meet the definition.

Ask your installer, in writing, whether the battery you are buying is designed only to store solar energy from your panels. If the answer is unclear, ask your council or a registered certifier before you sign.

This guide covers the battery. Solar panels have their own tests in the same SEPP. For panels that are not ground-mounted, subsection 2.41(4) says that in a prescribed residential zone, panels on a wall or roof facing a primary road must not protrude more than 0.5 metres from the wall or roof. On land containing a State or local heritage item or in a heritage conservation area, panels must not be visible from a primary road at any point where the road adjoins the property boundary, and must not protrude more than 0.5 metres. Our guide to ground-mounted solar panels covers arrays on a frame.

Exempt development: when you need no CDC and no DA

Exempt development means you need no CDC and no DA. A solar battery system is exempt only if it meets every requirement in subsection 2.41(5) of the Transport and Infrastructure SEPP.

The 20 kWh cap and the one-system limit

Subsection 2.41(5) sets two numeric tests. The system is not capable of storing more than 20 kWh of energy, and the development does not result in the installation of more than one system. Both must be met.

Do not assume that splitting storage across several cabinets, or adding a second unit later, keeps you inside the exempt pathway. Subsection 2.41(5) says the development must not result in the installation of more than one system, so adding a second battery system to a site that already has one usually means a CDC, where the site-wide total counts both systems. Confirm your pathway with a registered certifier or your council before you sign.

Other exempt conditions

Besides the two numeric tests above and the heritage test below, subsection 2.41(5) requires that:

  • the installation of the system complies with section 2.20, General requirements for exempt development, which includes meeting the relevant deemed-to-satisfy provisions of the Building Code of Australia
  • the system complies with AS/NZS 5139:2019
  • the battery is approved by the Clean Energy Council
  • the system is installed by a person accredited by Solar Accreditation Australia (SAA) for the installation of solar battery systems

The Clean Energy Council still keeps the approved product list, and SAA runs installer accreditation. They are two separate checks, so ask for both. Our buying batteries guide covers what else to check on a quote.

Heritage land under the exempt pathway

Heritage land does not rule out the exempt pathway, but the tests are stricter. Under subsection 2.41(5) of the Transport and Infrastructure SEPP, for land containing a heritage item or within a heritage conservation area, the system must be attached to the rear wall of an existing building. The general requirements for exempt development in section 2.20 still apply. A Heritage Act approval may also apply. If your home is heritage-listed or in a heritage conservation area, check with your council before you sign. For solar panels, see our guide to solar for heritage homes.

Complying development: when you need a CDC

You need a CDC when the battery cannot be exempt but meets the complying development requirements. A CDC is issued by your council or a registered certifier, and it must be issued before work starts. You can apply through the NSW Planning Portal.

The 100 kWh and 200 kWh site-wide caps

Under subsection 2.39(2C) of the Transport and Infrastructure SEPP, a CDC pathway is available where the maximum kWh storage capacity of all solar battery systems installed on the site does not exceed 100 kWh in a prescribed residential zone, or 200 kWh on other land, and the other requirements in that subsection are met. These are site-wide totals, not a limit for each battery, and they include any battery already on the site.

Capacity alone is not enough. The other complying development requirements in subsection 2.39(2C) are:

  • the development complies with section 2.22 of the Transport and Infrastructure SEPP
  • the system is installed in accordance with the manufacturer's specifications
  • the system is installed in accordance with specifications approved by the Clean Energy Council
  • the system is installed by a person accredited by Solar Accreditation Australia for the installation of battery systems
  • the system complies with AS/NZS 5139:2019
  • for land containing a heritage item or within a heritage conservation area, the system is not visible from any road at ground level at the property boundary

Here is how the site total works if you already have a battery. Say there is an existing 10 kWh battery and you add a new 15 kWh battery. Adding a second battery system usually means a CDC, and the combined 25 kWh counts toward the site-wide cap, not only the 15 kWh of the new unit. Confirm the pathway with a registered certifier or your council before you sign.

Some land is still excluded from a CDC, such as critical habitat, wilderness and environmentally sensitive areas, so your certifier will check this.

What a prescribed residential zone is

Section 2.35 of the Transport and Infrastructure SEPP defines a prescribed residential zone as Zone R1 General Residential, R2 Low Density Residential, R3 Medium Density Residential, R4 High Density Residential, R5 Large Lot Residential, RU5 Village, or an equivalent zone. In those zones a CDC is available only if the site-wide total does not exceed 100 kWh, and on other land only if it does not exceed 200 kWh. Check the zone on your property's planning certificate (the section 10.7 certificate) or on the NSW Planning Portal. Do not guess from the look of the building or the street. Confirm your zone before you rely on either figure.

Heritage land under the CDC pathway

From 12 December 2025, the CDC pathway is also available on heritage properties. Under subsection 2.39(2C) of the Transport and Infrastructure SEPP, for land containing a heritage item or within a heritage conservation area, the system must not be visible from any road at ground level at the property boundary. Under subsection 2.39(2D), the heritage exclusion in section 1.17A(1)(d) of the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 does not apply to a solar battery system on that land. That does not remove every Heritage Act requirement, so a Heritage Act approval may still apply. Ask your council or a registered certifier to confirm before you sign.

What changed on 12 December 2025

From 12 December 2025, NSW added a complying development pathway for medium-sized solar battery systems, including on heritage properties, with a site-wide total that does not exceed 200 kWh, or 100 kWh in a prescribed residential zone. The Department of Planning, Housing and Infrastructure's summary of the changes records two more. The term "small-scale battery system" was replaced with "solar battery system", and installer accreditation in the SEPP now refers to Solar Accreditation Australia rather than the Clean Energy Council. The Clean Energy Council approved product list still matters for the battery itself.

When you need a development application

If the proposal cannot meet the exempt or complying development requirements, you need a development application, or a modification to an existing consent, lodged with the relevant consent authority. That is usually the council. For example, a DA is the path where the battery total on the site would exceed the CDC cap for your zone.

Falling outside the exempt and CDC pathways does not guarantee that a DA will be approved. Talk to your council early and ask what it needs to see before you commit to a battery.

See the battery rebate your quote should show

The federal battery rebate steps down on 1 January 2027. Then a solar expert goes through it with you, and your quote, before you sign.

Battery rebate steps down on 1 January 2027 (rate set by install date)

Not ready yet? Get the battery size guide

AS/NZS 5139 and where the battery can go

AS/NZS 5139:2019 is the installation safety standard for battery energy storage systems. It is not a substitute for planning approval. Meeting the standard does not, by itself, make the work exempt or complying development, and a planning approval does not replace the standard.

Amendment 1 to AS/NZS 5139:2019 (Amendment 1:2025) was published on 19 December 2025, and the NSW Government says it is now mandatory. The standard sets rules on where a battery can go, so your installer must work to the current text, including the amendment. Older summaries of the location rules were written before the amendment, so do not treat them as the current standard.

For how location rules play out on one product, see our Sungrow SBR battery page, and ask your installer which edition and amendment of the standard they are working to.

Network approval is a separate step

You still need network approval in almost every grid-connected case. Planning approval and network approval are separate. A CDC or a DA does not replace the connection application to your distribution network, and a connection offer does not replace planning approval.

Your installer usually lodges the connection application with Ausgrid, Endeavour Energy or Essential Energy, depending on where you live. Our guide to how solar installation works sets out where that step fits.

Strata is separate again. Even when no council approval is needed, owners corporation approval can still be required for work on common property or for equipment on the outside of the building. Check your strata scheme's by-laws and ask the owners corporation before you sign.

Questions people ask

Do I need council approval for a solar battery in NSW?

expand_more
Often no, if it is a solar battery system that is not capable of storing more than 20 kWh, the development does not result in the installation of more than one system, and it meets every other exempt development requirement in subsection 2.41(5) of the Transport and Infrastructure SEPP. Larger systems, or more than one system, may need a Complying Development Certificate, or a development application if they cannot use the CDC pathway. Confirm your pathway with your council, a registered certifier or your installer before you sign.

What is the 20 kWh exempt limit?

expand_more
A solar battery system is exempt development only if it is not capable of storing more than 20 kWh of energy and the development does not result in the installation of more than one system. Under subsection 2.41(5), the installation must also comply with the general exempt requirements in section 2.20, the system must comply with AS/NZS 5139:2019, the battery must be approved by the Clean Energy Council, and the installer must be accredited by Solar Accreditation Australia for solar battery systems. On heritage land, the system must be attached to the rear wall of an existing building.

When do I need a CDC for a solar battery in NSW?

expand_more
When the battery cannot be exempt, a CDC may be available where the site-wide total storage of all solar battery systems does not exceed 100 kWh in a prescribed residential zone, or 200 kWh on other land. The system must also be installed to the manufacturer's specifications and to specifications approved by the Clean Energy Council, be installed by an SAA accredited installer, comply with AS/NZS 5139:2019 and meet the other requirements in subsection 2.39(2C). Your council or a registered certifier issues the CDC before work starts.

Do the 100 kWh and 200 kWh caps include a battery I already have?

expand_more
Yes. The caps are site-wide totals for all solar battery systems on the site, not a limit for each battery. Adding a second battery system usually means a CDC, so an existing 10 kWh battery plus a new 15 kWh battery counts as 25 kWh toward the cap. Confirm the pathway with a registered certifier or your council before you sign.

What if my property is heritage listed?

expand_more
Heritage land is not automatically a DA. Under the Transport and Infrastructure SEPP, an exempt battery on land containing a heritage item or within a heritage conservation area must be attached to the rear wall of an existing building. Under the CDC pathway from 12 December 2025, the system must not be visible from any road at ground level at the property boundary, and the Codes SEPP heritage exclusion in section 1.17A(1)(d) does not apply to it. A Heritage Act approval may still apply, so check with your council before you sign.

Does AS/NZS 5139 mean I can skip planning approval?

expand_more
No. AS/NZS 5139:2019 is the installation safety standard for battery systems, and meeting it does not make the work exempt or complying development. Amendment 1 to the standard was published on 19 December 2025 and is now mandatory in NSW.

Do I still need approval from my electricity network?

expand_more
Yes, in almost every grid-connected case. Network approval and planning approval are separate, so a CDC or a DA does not replace the connection application, and a connection offer does not replace planning approval. Your installer usually lodges the application with Ausgrid, Endeavour Energy or Essential Energy.

What if my battery can charge from the grid?

expand_more
The exempt and CDC pathways on this page apply to a solar battery system, which section 2.35 of the SEPP defines as a battery system designed only for the purposes of the storage of photovoltaic solar energy generated from a solar energy system. A battery designed to charge from the grid, trade electricity or operate as standalone storage may fall outside that definition and need a different pathway. Ask your council or a registered certifier before you sign.

Sources

Checked on 26 November 2026.

Get a quote from a Why Solar Approved installer

We match you with one installer who has passed all six of our checks. You get one written quote, and a 15-minute call with one of our solar experts before you sign. Getting a quote through us is free, with no obligation to go ahead. Installers pay us a set fee for each introduction.

The next step

If you're considering a home battery system, Bec and the team can match you with one Why Solar Approved installer near you for a free written quote, and fifteen minutes with a solar expert before you sign.

Not ready yet? Get the battery size guide

Headshot of Bec Ramirez, Aussie Mum & Energy Expert at Why Solar

Written by

Bec Ramirez

Aussie Mum & Energy Expert

Helps families switch to solar with practical, real-world advice. Bec focuses on the financial side: rebates, bill savings and financing options, so everyday Australians can see real value from going solar.

If you have any questions about the information in this guide, email hello@whysolar.com.au or call +61 2 5657 6527.

More about Bec

Make Why Solar a preferred sourceWe'll appear more often in your Google Top StoriesAdds Why Solar to your Google preferred sources, so we show up more often in your Top Stories and AI Overviews.
Share with a mate
Up to $8,000+ in solar and battery rebates · Federal rebates step down in 33 daysSee how we calculate this